Infrastructure

INFRASTRUCTURE
 
 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on 
 
:30 Acres
 
:Yes
 
 
:Yes
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
  
: Completed
 
Yes
Yes
iii
Permanent buildings constructed
 
 
: CPWD pattern
iv
School building
 
 
: Completed
v
Dormitories
:  Boys 06 Nos.
   with Warden Residence  06  Nos.
 
 
:  Girls 04 Nos.
   with Warden Residence  04 Nos.
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
Complete
 
Two Shifts
vii
Principal Residence
 
 
01  Nos.
viii
Staff Quarters
 
 
 
 
: Type III = 16  Nos.
  Type II = 01 Nos.
  Type  I  = 12 Nos.
 SP Sheds converted into Staff Qrs.:----- Nos.
ix
M.P. Hall
 
:Not available
x
Workshop
 
: Not available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Column based
 
:  1,00,000 litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
Available
:  1,00,000 litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
:  Kirlosker  make
:   10/15 KV
: Working
: Year of procurement
 1997 and 2005
xiv
Sewage Pump
 
: ------ H.P.( Not Available )
xv
Water Pump
 
: 10Hp 5HP capacity
xvi
Electrification
 
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
:Urban Feeder
:Complete
: 48 big 12 small  Nos. of Poles
 
Yes
 
 
: 22 hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
: Available
: 02-Nos.   
: Not Available 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
:  Potable,  01  Nos.-  working
:  Potable,  01 Nos.-   not working
:  Not available
xix
Rajiv Gandhi Smriti Van
 
:  Available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
:
:- June’2013
xxii
Whether area around transformer is fenced
:   No   ( Situated outside Campus)
xxiii
Whether open wells, if any, are covered from top
:   No open wells in the campus
xxiv
Works taken up under M&R fund during current year and last year:-
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
 
 
Carpentering / Masan works
Painting of School building